1. Narjes Sabeghi , Hamed Reza Tareghian , Erik Demeulemeester , Hasan Taheri , Determining the timing of project control points using a facility location model and simulation , Computers and Operations Research , Volume ( 61 ) , 2015-3, Pages 69-80
  2. Morteza Jafarzadeh , Hamed Reza Tareghian , Freydoon Rahbarnia , Reza Ghanbari , Optimal selection of project portfolios using reinvestment strategy within a flexible time horizon , European Journal of Operational Research , Volume ( 243 ) , 2015-2, Pages 658-664
  3. Ali Reza Soheili , Asghar Kerayechian , Hamed Reza Tareghian , nooshin davoodi , Adaptive Numerical Simulation of Traffic Flow Density , Computers and Mathematics with Applications , Volume ( 111 ) , 2013-7, Pages 227-237
  4. Hamidreza Usefzadeh , Hamed Reza Tareghian , Hybrid solution method for resource-constrained project scheduling problem using a new schedule generator , International Journal of Advanced Manufacturing Technology , Volume ( 64 ) , 2012-1, Pages 214-231
  5. Hamidreza Usefzadeh , Hamed Reza Tareghian , Mohammad Hadi Farahi , Tri-directional Scheduling Scheme:Theory and Computation , Journal of Mathematical Modelling and Algorithms , Volume ( 7 ) , 2010-11, Pages 357-373
  6. Hamed Reza Tareghian , Majid Salari , On the Optimal Frequency and Timing of Control Points in a Project Life Cycle , International Journal of Industrial Engineering and Production Research , Volume ( 20 ) , 2009-12, Pages 92-98
  7. Hamed Reza Tareghian , - - , A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search , Applied Mathematics and Computation , Volume ( 190 ) , 2007-7, Pages 1136-1145
  8. Hamed Reza Tareghian , On the Estimate of Mean Activity Durations in PERT Networks , The Korean Journal of Computation and Applied Mathematics , 2006-6
  9. Hamed Reza Tareghian , An application of randomized minimum cut to the project time/cost tradeoff problem , Applied Mathematics and Computation , 2005-5
  10. Hamed Reza Tareghian , Seyed Hasan Taheri , Seyed Reza Mirrazavi , Zahra Naji Azimi , Using Scatter Search to solve a multi-objective transportation problem- a case study , علوم-دانشگاه فردوسی مشهد , Volume ( 4 ) , 2002-7, Pages 19-28
  11. GholamHossain Shahkar , Hamed Reza Tareghian , Designing a production iine through optimisation of M/G/c* using simulation , Mathematical engineering in industry , 2001-2
  12. Ali Vahidian Kamyad , Hamed Reza Tareghian , Production Planning in Fuzzy Environment , The Korean Journal of Computation and Applied Mathematics , Volume ( 6 ) , 1999-2, Pages 315-329